Coal fuel conveying system of thermal power plant
The coal-fired conveying system of a thermal power plant is a combination of equipment that completes the transportation and storage of coal. It includes the entire technological process from the time coal transport vehicles enter the site to unload coal, to transport qualified coal, such as the original coal hopper of the boiler house. Generally consists of four parts: unloading coal, loading coal, coal storage and coal blending. The coal-fired system must store enough coal and timely conveying the required coal to the boiler house.
What is the process of coal fuel conveying system in thermal power plant?
Coal unloading equipment ----> Coal receiving equipment -----> Coal yard and coal storage equipment and coal blending ---> Coal conveying equipment -----> Coal crushing, screening and pulverizing ---> Coal conveying lifting equipment ------> Original coal hopper of power plant boiler room. For coal-electricity integration projects, coal fuel may be directly transported to the near-ground stockyard of the power plant through ultra-long-distance belt conveyors.
Shanghai Kuqiao Equipment Co., Ltd (SKE) is one of the professional supplier of coal-fired conveyor system solutions for power plants. We are able to provide belt conveyor system solutions such as stacking, reclaiming, crushing, screening, and pulverizing, batching and lifting in the coal yard.
- Tel
- *Title
- *Content